Abstract : This study aims to determine how effective and efficient the production line and calculate the optimal time  to process a candy product. The data was measured by stopwatch, then tested for uniformity and adequacy to obtain a value to do line balancing analysis using the Killbridge and Wester methods and Rank Position Weight, then performance of the  initial line  is compared with the results of analysis. The results of analysis using both line balancing methods, show that line efficiency were 76.1%, increasing by 43.1% from the efficiency of the initial line by 33%. The result of the balance delay (BD) calculation is 23.92% decreased by 53%, and the smoothness index 17.79  fell by 74.98  from the initial line which means that the proposed production line are more efficient than the initial line. The optimum time needed for production start from sugar tipping to the packaging are 91,29 minutes.

Keywords: line balancing; line efficiency; Killberg & Wester; Rank Position Weight

Abstrak : Penelitian bertujuan untuk mengetahui seberapa efektif dan efisien lintasan produksi yang digunakan pada proses produksi permen, serta menghitung waktu optimal yang dibutuhkan dalam produksi. Pengambilan data primer dilakukan dengan metode pengukuran langsung menggunakan jam henti  yang selanjutnya diuji keseragaman, dan kecukupan datanya sehingga diperoleh sebuah nilai untuk kemudian dilakukan analisis keseimbangan lini dengan menggunakan metode Killbridge dan Wester dan Rank Position Weight. Selanjutnya performansi lintasan awal dibandingkan dengan hasil analisis keseimbangan lini. Dari hasil analisis menggunakan kedua metode line balancing tersebut diperoleh hasil efisiensi lini sebesar 76,1%,  meningkat sebesar 43,1% dari efisiensi keadaan lintasan awal sebesar 33%. Hasil perhitungan balance delay (BD) adalah sebesar 23,92% turun 53% dari kondisi awal; dan  smoothness index 17,79 turun sebesar 74,98 yang artinya hasil analisis lintasan usulan lebih efisien dibandingkan dengan keadaan lintasan awal. Hasil analisis waktu optimum yang dibutuhkan untuk produksi mulai dari tipping gula sampai proses pengemasan adalah 91,29 menit.

Kata kunci: efisiensi lini produksi,  keseimbangan lintasan; Killberg & Wester; Rank Position Weight


Keywords


lintasan produksi, line balancing, Killberg & Wester, Rank Position Weight, efisiensi lini produksi

References


Kementerian Perindustrian, Analisis Perkembangan Industri, Pusdatin Kemenperin, 2019.

V. Gaspersz, Production Planning & Inventory Control, Jakarta: Gramedia Pustaka Utama, 2004.

T. Baroto, Perencanaan dan Pengendalian Produksi, Jakarta: Ghalia Indonesia, 2002.

A.H. Halim, Perencanaan dan Pengendalian Produksi : Keseim-bangan Lintasan, Bandung : Institut Teknologi Bandung, 2003.

C. Malave, Approach to Line Balancing Comsoal & RPW, Texas A&M University, 2000.

Pachghare, Vrittika, R. S. Dalu, “Assembly Line Balancing Methods – A Case Study”, International Journal of Science and Research (IJSR), volume 3, issue 5, May, hal. 1901-1905, 2014.

Hamza, R.M. Ali and J.Y. Al-Manaa, “Selection of Balancing Method for Manual Assembly Line of Two Stages Gearbox”, Global Perspectives on Engineering Management, vol. 2, issue 2, May, hal. 70-81, 2013.

Daelima,V. Fiesta, E. Febianti, dan M.A. Ilhami, “Analisis Keseim-bangan Lintasan untuk Meningkatkan Kapasitas Produksi dengan Pendekatan Line Balancing dan Simulasi”, Jurnal Teknik Industri, vol.1, no.2, Juni, hal 107-113, 2013.

Sinaga dan T. Sarma, “Pengukuran Keseimbangan Lintasan Produksi Keramik Dengan Metode Helgeson Dan Birnie di PT.XYZ”, Jurnal Teknologi Technoscientia, vol. 7, no. 1, Agustus , 2014.

I. Purnamasari dan A.S. Cahyana, “Line Balancing Dengan Metode Ranked Position Weight (RPW)”, Spektrum Industri, vol. 13, no. 2, hal. 115 – 228, 2015.

M. Djunaidi dan Angga, “Analisis Keseimbangan Lintasan (Line Balancing) Pada Proses Perakitan Body Bus Pada Karoseri Guna Meningkatkan Efisiensi Lintasan”, Jurnal Ilmiah Teknik Industri, vol. 5, no. 2, hal. 77 – 84, 2017.

Ekoanindiyo, F. Ardiansyah dan L. Helmy, “Meningkatkan Efisiensi Lintasan Kerja Menggunakan Metode RPW dan Killbridge-Western”, Dinamika Teknik, vol. X, no. 1, Januari, hal 16 – 26, 2017.

Pratama dan F. Yoga, “Analisis Keseimbangan Lintasan Produksi Pada Kelompok Kerja Backpost And Rib Menggunakan Metode Ranked Positional Weight (Studi Kasus Pada PT. Yamaha Indonesia)”, skripsi, Universitas Islam Indonesia, Yogyakarta, 2018.


Full Text: PDF (INDONESIA)

Article Metrics

Abstract View : 2148 times
PDF (INDONESIA) Download : 5248 times

 DOI: 10.30988/jmil.v3i1.63

Refbacks

  • There are currently no refbacks.